PROPOSED DEVELOPMENT OF PARK CONNECTOR ALONG KRANJI EXPRESSWAY (KJE), WOODLANDS ROAD, SUNGEI LANCHAR, PAN ISLAND EXPRESSWAY (PIE) AND PIONEER ROAD NORTH
TERM CONTRACT FOR UPGRADING AND MAINTENANCE WORKS FOR SINGAPORE BOTANIC GARDENS (SBG), JURONG LAKE GARDEN (JLG) AND FORT CANNING PARK AND ISTANA (FCPI) FOR A PERIOD OF THREE (3) YEARS WITH OPTION FOR ANOTHER THREE (3) YEARS
DEV 181 HOTEL LOBBY RENOVATION (LANDSCAPE WORKS) AT MARINA BAY SANDS, SINGAPORE
HOARDING WORKS, SITE CLEARANCE, TREE FELLING AND EARTHWORKS FOR UNITED WORLD COLLEGE OF SOUTH EAST ASIA NEW CAMPUS DEVELOPMENT AT TENGAH NEW TOWN
TERM CONTRACT FOR THE TRAIL REPAIR, MAINTENANCE AND UPGRADING WORKS OF PARK FACILITIES FOR BUKIT TIMAH NATURE RESERVE, CENTRAL CATCHMENT NATURE RESERVE AND KENT RIDGE PARK MOUNTAIN BIKING TRAIL FOR A PERIOD OF THREE (3) YEARS
CONSTRUCTION OF ROAD RELATED FACILITIES (RRF) AT TENGAH TOWN (PHASE 4)
PROJECT D2023-00355 – CONSTRUCTION OF NETTED ENCLOSURES ALONG PIONEER SECTOR 2, MANDAI ROAD AND SELARANG RING ROAD
PROPOSED ADDITIONS AND ALTERATIONS AND OTHER WORKS FOR EXISTING MONUMENT AND DEVELOPMENT
ROAD AND COMMUTER INFRASTRUCTURE WORKS
PROPOSED DEVELOPMENT OF TEACHERS ESTATE PARK
TERM CONTRACT FOR MAINTENANCE AND UPGRADING WORKS FOR PARKS FACILITIES FOR PARKS IN PARKS NORTH WEST BRANCH FOR A PERIOD OF THREE (3) YEARS
PROPOSED DEVELOPMENT OF PUNGGOL HERITAGE TRAIL
ADDITIONS AND ALTERATIONS (A&A) TERM CONTRACT FOR MINISTRY OF EDUCATION (MOE) FACILITIES FOR A PERIOD OF THREE (3) YEARS
2+1 YEAR TERM CONTRACT FOR CIVIL ENGINEERING WORKS

PROPOSED DEVELOPMENT OF PARK CONNECTOR ALONG KRANJI EXPRESSWAY (KJE), WOODLANDS ROAD, SUNGEI LANCHAR, PAN ISLAND EXPRESSWAY (PIE) AND PIONEER ROAD NORTHWORKS

_____________________________________________________________________________________________________________________________

Name of Client :                       National Parks Board
Role :                                           Main Contractor
Expected Completion :           
Jun 26

Project Value :                             S$ 10 million

Construction of Park Connector Network (approx. 5km) involving:

– 2.5m to 4m wide shared cycling path – Typically RC Slab finished with colour coating / markings or asphalt
– Surface water drain
– Retaining Walls ( ranging from 1.5m to 3.5 m depth)
– Ramps, Staircases, and railings
– Lightings
– Signage and imprints
– Planting – trees and shrubs
– Park Furniture